True Grade Concrete of Lake County|(567) 298-3296|Mon–Fri 7am–7pm, Sat 8am–3pm

How We Pour

True Grade Concrete pours driveways at 5 inches, patios and walks at 4 inches, using 4,000 psi air-entrained concrete over 4 inches of compacted limestone, fiber reinforcement, control joints cut the same day, and a pitch of at least 1/8 inch per foot away from the house. Walk at 48 hours, drive at 7 days, full strength at 28 days.

Insured · Written quote in 48 hours · Tear-out included · 1-year come-back guarantee

InsuredWritten quote in 48 hoursTear-out included1-year come-back guaranteePrices published

The Spec, Line By Line

This is what the crew is held to on every job. Hand the PDF to any other contractor you are comparing and ask them to match it line for line.

Driveway thickness5 inches
Apron thickness6 inches
Patio and walkway thickness4 inches
Garage floor thickness4 inches (5 inches at the door)
Concrete strength4,000 psi, air-entrained, 5–7% air entrainment
Base4 inches of compacted #57 limestone (6 inches over clay or fill)
Reinforcementfiber mesh in every pour; #4 rebar at aprons, garage thresholds, and steps
Control jointscontrol joints at 10 feet on 4-inch slabs, 12 feet on 5-inch slabs, cut the day of the pour, depth one-quarter of slab thickness
Expansion jointshalf-inch expansion joint at every house wall, garage slab, and existing concrete
Drainage pitchminimum 1/8 inch per foot away from the house; 1/4 inch per foot where the lot allows
Finishmedium broom finish for traction; stamped work gets color hardener, release, and a non-slip sealer
Cure schedulewalk on it at 24–48 hours, drive on it at 7 days, full strength at 28 days
Sealingpenetrating silane/siloxane sealer at 28 days, resealed every 2–3 years
Weather limitsno pours below 40°F without blankets and accelerator; no pours on frozen subgrade; no pours in rain

Download The One-Page Spec (PDF)

The Job, Step By Step

Site Visit And Written Quote

We measure, check where water goes now, look at the apron and city sidewalk, and send a written quote within 48 hours.

Tear-Out And Base

Old concrete out, subgrade cut to depth, compacted stone base set to the finished grade.

Forms And String Line

Forms set to the slope we agreed on, checked twice with a string line and level before we order concrete.

Pour And Finish

Air-entrained 4,000 psi mix, fiber reinforcement, broom finish, control joints cut the same day.

Cure And Walk-Through

We walk the finished slab with you, explain the cure timeline, and come back if anything is not right.

See the full spec: thickness, psi, base, joints, cure

Why Each Line Is There

Why 5 inches for driveways when code says 4

Four inches is the residential minimum. The fifth inch adds about 55% more bending strength for roughly 12% more concrete. In a freeze-thaw climate with plow trucks and delivery vans, that is the cheapest insurance on the job.

Why a stone base instead of pouring on dirt

Clay holds water; water freezes; the slab lifts. Four inches of compacted #57 limestone drains, spreads the load, and gives a uniform surface so the slab does not span a soft spot and crack.

Why air entrainment

Air-entrained concrete has billions of microscopic bubbles that give freezing water room to expand. Without it, surface scaling shows up in two or three Ohio winters, especially with salt.

Why control joints on pour day

Concrete shrinks as it cures and it will crack. Joints cut at one-quarter depth the same day, spaced at 2 to 2.5 times the thickness in feet, decide where. Cut late and the slab has already chosen.

Why fiber in every pour

Fiber controls plastic shrinkage cracking in the first hours and holds micro-cracks tight. Rebar goes where loads concentrate: aprons, garage thresholds, and steps.

Why we will not pour on a frozen or wet subgrade

Frozen ground thaws and settles under the new slab. Standing water in the forms weakens the mix at the bottom, where strength matters most. We reschedule rather than pour a slab we would not put our name on.

What This Spec Is Not

It is not a promise that the slab will never crack. Concrete cracks; the spec puts the cracks in the joints. It is not a substitute for the site visit: clay lots get 6 inches of base, steep lots get extra drainage, and the written quote says so. And it is not marketing: the numbers come from ACI 330 for residential pavements and the City of Mentor driveway standard, and we chose the stricter of the two wherever they differ.

Why thickness matters · Why concrete cracks · What the guarantee covers

Get A Written Quote Within 48 Hours

Tell us what you need and where. We come out, measure, check the drainage, and send an itemized quote. No pressure, no surprises.

(567) 298-3296
CallTextGet A Quote